Difference between revisions of "Bait and Switch (Mission)"
Greenfelt22 (talk | contribs) m |
Greenfelt22 (talk | contribs) |
||
Line 7: | Line 7: | ||
|date=June 28, 2390 | |date=June 28, 2390 | ||
|span= | |span= | ||
− | }}With Task Group Belvedere deploying a sensor net along a line from Gavara across New Risa to Altair, the crew of the Black Hawk, along with two other ships, work to set a trap near Nebula G71-2B. Sensors are unable to penetrate the nebula, leaving the crew to think that it’s a good place for someone to hide. | + | }} |
+ | :'''''NOTE:''' This mission ran concurrent with [[Cover of Darkness (Mission)|Mission 26: Cover of Darkness]].'' | ||
+ | |||
+ | With Task Group Belvedere deploying a sensor net along a line from Gavara across New Risa to Altair, the crew of the Black Hawk, along with two other ships, work to set a trap near Nebula G71-2B. Sensors are unable to penetrate the nebula, leaving the crew to think that it’s a good place for someone to hide. | ||
The trap, a convoy assembled from Gamma Command’s two Defiant class escorts and two of their Wallenburg transports, is dispatched from Gavara to New Risa. The Black Hawk and its escorts attempt to mask their warp signatures as they follow the convoy, ready to jump in within seconds once (if) their mysterious attackers reveal themselves. | The trap, a convoy assembled from Gamma Command’s two Defiant class escorts and two of their Wallenburg transports, is dispatched from Gavara to New Risa. The Black Hawk and its escorts attempt to mask their warp signatures as they follow the convoy, ready to jump in within seconds once (if) their mysterious attackers reveal themselves. | ||
Line 18: | Line 21: | ||
=Timeline= | =Timeline= | ||
− | :'' | + | ;Backposts |
+ | |||
+ | * [https://blackhawk.anurasims.com/index.php/sim/viewpost/1888 A Matter of Security] (June 21, 2390) | ||
+ | |||
+ | ;Day 1 (June 28, 2390) | ||
+ | |||
+ | * 1000 hours: [https://blackhawk.anurasims.com/index.php/sim/viewpost/1889 The Best Laid Plans] | ||
+ | |||
+ | ;Day 2 (June 29, 2390) | ||
+ | |||
+ | * 0730 hours: [https://blackhawk.anurasims.com/index.php/sim/viewpost/1899 Tour: Engineering] | ||
+ | * 0745 hours: ''Tour: Counseling (in progress)'' | ||
+ | * 0800 hours: [https://blackhawk.anurasims.com/index.php/sim/viewpost/1894 Tour: Security] | ||
+ | * 0815 hours: ''Tour: Science (in progress)'' | ||
+ | * 0830 hours: [https://blackhawk.anurasims.com/index.php/sim/viewpost/1892 Tour: Flight Deck] | ||
+ | * 0844 hours: ''Tour: Sickbay (in progress)'' | ||
+ | * 0900 hours: ''Tour: Intel (in progress)'' | ||
+ | * 0915 hours: [https://blackhawk.anurasims.com/index.php/sim/viewpost/1893 Tour: Administration] | ||
+ | * 0930 hours: ''Tour: Auxiliary Control (in progress)'' | ||
+ | |||
+ | ;Day 3 (June 30, 2390) | ||
+ | |||
+ | * ''Cabin Fever (in progress)'' | ||
=OOC Information= | =OOC Information= | ||
− | Mission 25 began on October 1, 2024 and ran concurrently with [[Cover of Darkness (Mission)|Cover of Darkness]]. Since then, | + | Mission 25 began on October 1, 2024 and ran concurrently with [[Cover of Darkness (Mission)|Cover of Darkness]]. Since then, 9 posts have been published. |
= External Information = | = External Information = |
Revision as of 07:22, 15 November 2024
Bait and Switch | |
Season: | |
Episode: |
25 |
Date: |
June 28, 2390 |
Template:Mission |
- NOTE: This mission ran concurrent with Mission 26: Cover of Darkness.
With Task Group Belvedere deploying a sensor net along a line from Gavara across New Risa to Altair, the crew of the Black Hawk, along with two other ships, work to set a trap near Nebula G71-2B. Sensors are unable to penetrate the nebula, leaving the crew to think that it’s a good place for someone to hide.
The trap, a convoy assembled from Gamma Command’s two Defiant class escorts and two of their Wallenburg transports, is dispatched from Gavara to New Risa. The Black Hawk and its escorts attempt to mask their warp signatures as they follow the convoy, ready to jump in within seconds once (if) their mysterious attackers reveal themselves.
Summary
- Coming Soon
Timeline
- Backposts
- A Matter of Security (June 21, 2390)
- Day 1 (June 28, 2390)
- 1000 hours: The Best Laid Plans
- Day 2 (June 29, 2390)
- 0730 hours: Tour: Engineering
- 0745 hours: Tour: Counseling (in progress)
- 0800 hours: Tour: Security
- 0815 hours: Tour: Science (in progress)
- 0830 hours: Tour: Flight Deck
- 0844 hours: Tour: Sickbay (in progress)
- 0900 hours: Tour: Intel (in progress)
- 0915 hours: Tour: Administration
- 0930 hours: Tour: Auxiliary Control (in progress)
- Day 3 (June 30, 2390)
- Cabin Fever (in progress)
OOC Information
Mission 25 began on October 1, 2024 and ran concurrently with Cover of Darkness. Since then, 9 posts have been published.
External Information
Complete Mission Logs for Episode 25: Bait and Switch